Job shop software connects custom customer orders with estimates, material requirements, production routes and the work recorded on the shop floor. Each job can have a different sequence even when it uses familiar equipment.
An accepted quote describes the commercial commitment and its estimated basis. The route released to production and the operations actually performed can later differ from that estimate.
Follow custom jobs from accepted estimate to actual costsCollapse introduction
Compare how the system keeps those records connected through scheduling, outside processing and partial completion. A machine calendar is useful, but does not explain material readiness, remaining quantities or the cost of unfinished work.
ProShop is an integrated ERP, MES and QMS suite that lets precision machine shops run quoting, work orders, scheduling, inventory, inspections and job costing in one paperless system.
Key details 3
Job Costing
Full supportBuilt in
What you can do
Live job costing of labor, material and machine costs
Estimate-versus-actual comparison
P&L reports by job, customer or time period
Job Tracking
Full supportBuilt in
What you can do
Live job tracking with operator clock in and out
Progress tracking across departments with dashboards and delay alerts
Estimating
Full supportBuilt in
What you can do
Template-driven quotes using labor, material and vendor costs
Profit guards and quantity breaks with below-margin flagging
Conversion of awarded quotes to customer POs and work orders
Job shop software links the customer commitment to a production record
The starting estimate brings together the requested work, relevant specification, expected material, operations and quoted commercial basis. When the job is accepted, the shop needs an identifiable record of what was agreed and what is released to be made. Repeat work may reuse earlier information, while a new custom order needs its own applicable specification and estimate. Copying a previous route should not silently make every earlier assumption correct for the new job.
The distinction matters when work changes. A revised drawing or customer requirement can affect material, setup, outside operations and the delivery commitment. Staff need to understand the authorised change and its relationship to the original estimate, rather than overwrite the quote and lose the explanation for later cost differences. The relevant technical and commercial decisions remain with the responsible people.
Scheduling needs the prerequisites for the next operation
A job can share a machine with repeat work while waiting for material, an earlier operation or an outside supplier. The schedule needs enough context to distinguish occupied capacity from work that is ready to advance. Moving an operation to another resource may change the working route and assumptions about time; the actual choice needs review for the shop's equipment and process. The software should show outstanding quantities and blockers in the same operational picture, rather than turn every delay into an unexplained new due date. Broader planning and manufacturing-execution tools may contribute parts of that picture without owning the whole customer job.
Partial completion and actual costs need to remain connected
Some quantity may be completed while another part remains in production or with an outside processor. Material issued, work recorded, goods received back and quantities shipped are separate events. Staff need to follow the unfinished work without treating the entire job as complete after one operation or delivery. Returned, rejected or repeated work also needs an explanation appropriate to the shop's reviewed process.
The financial comparison should retain the accepted estimate alongside actual material, labour and external costs. That lets the team investigate a difference without pretending that the latest route was the original plan. Accounting treatment and the value of work in progress need qualified validation. Include open jobs, current routes, commitments and interpretable cost history in implementation, together with responsibility for purchasing, shop-floor and accounting interfaces. A technically completed import or a closed calendar slot does not establish a reconciled job position or suitable engineering outcome.
Essential storage keeps accounts secure and remembers your comparison choices. Optional analytics helps us understand how the catalog is used. Read our Privacy Policy, Cookie Policy and Legal Information.